The JJ Mack Constructing / Lifschutz Davidson Sandilands

The JJ Mack Constructing / Lifschutz Davidson Sandilands
Textual content description offered by the architects. An workplace for the longer term. The JJ Mack Constructing (33 Charterhouse Avenue, Smithfield Market, London), designed by Lifschutz Davidson Sandilands for Helical plc and Ashby Capital, is a good-looking stone-clad constructing that may facilitate new hybrid methods of working and assist lure and retain high expertise. Situated inside a three-minute stroll of Farringdon Station (Elizabeth Line, Thames Hyperlink, and London Underground), it presents a simple journey to a quintessential London neighborhood with cultural areas on its doorstep and nice eating places and cafés for lunch or drinks after work in a vigorous scene.

The façade on Charterhouse Avenue responds to the smaller scale of the listed Port of London Authority constructing subsequent door. A powerful south-facing, double-height foyer welcomes workers and guests. Stunning stone flooring tiles with bronze detailing, English reclaimed timber and a hanging bronze reception desk greet you on arrival. Alongside the east façade is an atrium with a full-height art work from the bottom to the fifth flooring, enclosed by (fire-rated) glazing. This presents a hanging, light-filled perimeter to the decrease flooring of the constructing.




An area-age bike park, accessed instantly off Farringdon Highway cycle tremendous freeway has 426 areas (1 for each 5 occupants), and two restore stations. Cyclists descend into a set of spa-quality altering areas (672 lockers, 30 showers), totally kitted with hairdryers, hair straighteners, and complementary towels. The constructing is designed to permit tenants to realize Platinum WELL score of their fit-out. Flooring are flooded with gentle and plenty of workstations have views of St Paul’s Cathedral, The Shard, and Smithfield Market.

Incorporating enhanced contemporary air techniques, low/no VOC paint, and entry to nature via expansive roof terraces on the fifth, seventh, and ninth flooring (complete 9,127 sqft). Two bee colonies stay on the roof. The constructing is future-proof in its development in addition to the subtle expertise that operates it. Every of the 9 flooring has versatile flooring plates and remarkably few columns, permitting incoming tenants to create layouts that work for his or her companies. A ‘good constructing’, it has subtle and cutting-edge expertise that permits collaboration via digital connectivity.


The JJ Mack Constructing achieved the best sustainability accreditations – BREEAM excellent on the design stage; and EPC A – because of sustainable, clever, and renewable applied sciences designed into the constructing. 144 photograph voltaic panels on the roof ship power again to the grid and offset on-site energy consumption and a ground-breaking water administration and recycling system reduces mains water consumption by as much as 70%.

Every flooring is break up into 4 zones to run localized air/cooling/heating/lighting to maximise consolation and reduce power wastage, cut back carbon emissions, and cut back power payments. All of this ensures that LDS’ JJ Mack Constructing gives a workspace that may make sure the workplace of the longer term stays the middle of the work ecosystem for a top-class workforce.
